We saw the most progress in this room this month with cabinets, ceiling and flooring.
Driveway done, although we're talking about teplacing the rock already.
Foyer left and dining right
Kitchen base cabinets in
Dining room window sings begun




Brick wall between foyer and dining
Mud cabinets in laundry room
Making his mark in his room
I found our pantry sliding door!
We've got interior doors!
Entry brick wall progress
Back patio pavers done.
Wall done and ready for floors
Everyone got kicked our for a few weeks while the wood floors went down. 
Floor progress in dining room.
Grace's bathroom
Grace's bathroom tile done!

Amazon floor tiles for the win!
Back patio with dining room and master doors in view


Living room 
Tongue and groove ceiling in the living room began
First of kitchen cabinets going in with wet bar and fridge frame
Progress on the ceiling
Davis bathroom floor tile is one of our favorite tiles of the whole project. 
Tongue and groove walls in Davis' bathroom
Pool bathroom floor tiles.
Little old and little new in the back yard. 
Playroom fireplace with new brick, concrete caps and board and batten.
Laundry room
Views at back patio door
And we received word that this guy was a rattlesnake that startled the landscapers as it slithered out our flower bed into the alley. We were on the lookout for him as we were petrified of anyone getting bit, esp the children. 
They finally caught him and killed him after he jumped at one of our subs. He traveled down the alley, up 74th,  down our driveway and into a bush close to our garage. Super territorial. He was an almost 6 foot gopher snake. 